PROCEDURES FOR DETERMINING DDH 280 REFIT CONTENT

Authors
  1. Bunce, L.R.
  2. Bijoor, R.G.
Corporate Authors
Operational Research and Analysis Establishment, Ottawa ONT (CAN) Directorate of Mathematics and Statistics
Abstract
The report considers the present method of determining preventive maintenance (PM) refit tasks to be performed on a DDH 280 class of ship and proposes a method whereby current methods could be improved. The report suggests that refit costs be studied in detail with a view to determining cost/repair time trade-offs, as the information would be one of the major factors in determining refit cycle lengths.
Report Number
PR-221 — Project Report
Date of publication
15 Jul 1983
Number of Pages
47
DSTKIM No
83-03076
CANDIS No
40745
Format(s):
Hardcopy;Originator's fiche received by DSIS

Permanent link

Document 1 of 1

Date modified: