BLAST TUBE TESTS - NAVAL STRUCTURES

Authors
  1. Proseilo, B.
  2. MacDonald, I.
  3. Bierbach, J.
Corporate Authors
Defence Research Establishment Suffield, Ralston ALTA (CAN);Ballistech Systems Inc, Medicine Hat ALTA (CAN)
Abstract
The report summarizes the work performed by Ballistech Systems Incorporated (BSI). The 1.8 m diameter Blast Tube facility at the Defence Research Establishment Suffield (DRES) required upgrading to provide operational capability during winter and to provide facilities for target model testing. To satisfy the winter operation requirement, cover structures were designed and constructed for the compressor, driver, and reserve bottle sections of the Blast Tube facility. To satisfy the target testing requirement, a test table for target mounting was designed and fabricated for installation in the test section of the Blast Tube.
Report Number
BSI-8854 — Contract Report (Final)
Date of publication
15 Mar 1989
Number of Pages
30
DSTKIM No
89-03864
CANDIS No
61758